Your Reliable Partner for Comprehensive Engineering Solutions
Expertly designed strategies to ensure seamless performance and top quality.

VORTEX
CONSTRUCTION
(PHILIPPINES)
PTE LTD CORP
Vortex Construction (Philippines) establish in 2024, continue to provide excellent services to its client and expending it network in the Philippines. To build long-lasting relationship with client thru is working ethic.
Your Single Source for Infinite Solutions
Pre-Feasibility Studies
Investigation and Surveys
Preliminary Design
Development of Schemes
Feasibility Studies
Land Use Study/ Survey
Project Economics/Market Study
Selection of Alternatives
Investment Cost Estimates
Detailed Engineering Design
Detailed Field Investigation
Topographic Survey
Civil, Plumbing and Electrical Design
Construction Materials Evaluation
Detailed Cost Estimates
Specifications and Contract Document

Preliminary Engineering Service
Boundary/ Relocation Survey
Digital Topographic Survey
Pre-Construction Services
Construction Drawing
Construction Planning, Scheduling and Monitoring
Periodic Safety Inspection
Materials Inspection
Renovation and Removal Measures
Project Cost and Quality Control
Post Construction Evaluation
Architectural Works
Partition/ Cabinet
Tiling/Painting
Fireproofing
Waterproofing
Shop Fabrication
Plumbing & Electrical
Design and Construction
VORTEX PH PROJECT
Project Handle by Engr Joel S. Reyes in Philippines and Singapore
World Trade Exchange Binondo Manila
Project Description: A 42nd Storey Commercial and residential building design by New World Properties Venture Inc with Micheal Graves Architecture as Consultant.
Works Activities: Bored pile with actual depth of 72m and Installed steel sheet pile to protect adjacent building, Construction of 42nd storey building.
Project Involvement: Supervision of Construction and Monitor all trade activities

NAIA-3 Villamor Air Base Pasay City
Project Description: NAIA Airport Terminal 3 Consortium joint venture with Project Developer Philippines International Air Terminal Corp. (Piatco ) and TAKENAKA Corporation JAPAN.
Works Activities: Isolated Footing, Concrete RC Column, Beam and Wall, Glass Cladding, Ceiling Board and Partition.
Project Involvement: Attend and Coordinated client work activities, Monitor and Coordinated trade supplier contractor, Supervision of Construction and Provide sufficient manpower for every day tasks.

University of the East– Samson Road Caloocan
Project Description: 8th Storey School Building for additional School room with Helipad.
Works Activities: Mat foundation Design, Formwork, Reinforcing bar and Concrete RC Column, Beam, Slab and Wall, Brick wall plaster, Precast Panel for wall. Steel Structure for Helipad.
Project Involvement: Supervision of Construction, Monitor and Coordinated work activities , Informed Client the status of Work schedule.

CAMANAVA Flood Control Project Malabon
Project Description: Eighteen natural and artificial waterways segment Malabon and crest during high tide and heavy precipitation.
In 2003, the national government, with funding and partnership from JICA. aimed at reducing flood prone areas by 75 percent within Malabon and its three neighboring municipalities.
Works Activities: Construction Mega dikes and Dredging to remove Mud Soil, Clay and Silt.
Project Involvement: Supervision of Construction and Monitor the weather and progress of work.

AZUMI BOUTIQUE Hotel Project Alabang Muntinlupa
Project Description: A 14th Storey Commercial and residential building with Roof deck and Infinity pool.
Works Activities: Foundation work, Formwork, Concreting RC Wall, Beam and Slab, Glass toilet partition, Elevator Lift Shaft.
Project Involvement: Monitor and Coordinated with all specialist contractor, Informed the Client the Status of Work activities.
Supervision of Construction and provide substantial manpower to complete the job related to cost estimate.

RND Project located at Pioneer Road
Project Description: A&A Expand RND Laboratory to crater additional Equipment.
Works Activities: Isolated Footing, Concreting RC Column, Beam, Slab and wall with Brick partition, Fire rated Ceiling panel, Steel Structure and Roofing sheet.
Project Involvement: Monitoring all trade contractor and supplier, Coordination the work activities schedule with client, Supervision of Construction and provide sufficient manpower to complete job on schedule.

Exxonmobil Swing Project Shipyard Road
Project Description: Installed 2nos. of 8000 liters Swing tank
Works Activities: Drilling 12 nos. of Bored pile with actual depth of 18m depth, Work inside the band-wall with the use of mobile crane to lift all equipment including excavator,
boring machine and casting of concrete using Pump Crate.
Project Involvement: Coordination with Bored pipe contractor and Client, Supervision of Construction and Manpower required in the Project.